BUILT DIFFERENTLY

Your legacy CTRM
ends here.

Eight capabilities that separate this platform from the systems you are replacing. Not upgrades. Different architecture.

P&L you cannot see until tomorrow morning
Real time positions and P&Lcomputed continuously, no overnight batch
Limit breaches found in the daily report
Pre trade limit checksevery ticket validated before execution
A report request means a six week vendor ticket
Custom report buildercurated views, built the same afternoon
Hedge effectiveness tested once a year, manually
Hedge advice and effectivenessIFRS 9 testing inside the workflow
Settlement, risk, and logistics in three different systems
One position of truthnet settlement and collateral in the same ledger
Every quarter end is a reconciliation marathon
Batch valuation engine10,000 plus positions revalued in one job
A new analyst needs three months to learn the screens
Clara, the learning layerasks in plain language, answers from your curated knowledge
The system never learns how your desk works
Implicit personalizationlayouts, defaults, and habits adapt per user
VALUATION RUN4 hours4 minutes
REPORT REQUEST6 weekssame day
LIMIT CHECKnext morningpre trade

This is what vigilance without anxiety looks like in the architecture.

NO CTRM? START HERE

Spreadsheets are not
a system.

Half the desks we talk to have no legacy platform to replace. Their positions live in spreadsheets, their limits in inboxes, their P&L in one person's head. The question is not which system to leave. It is whether the first one is worth the wait. It is. And it takes the same four to six weeks.

SEE THE SWITCHOVER PLAN →
SWITCHOVER

From legacy to live in
four to six weeks.

Replacing a CTRM should not take a year. A fixed-scope migration runs alongside your current system until you are ready to cut over.

WEEK 1-2

Map & extract

Deals, counterparties, curves, and master data exported from your legacy system and mapped into the new schema.

WEEK 3-4

Validate & reconcile

Positions and P&L run in parallel on both systems. Differences are investigated line by line until the books match.

WEEK 5-6

Train & cut over

Desks trained on live data, workflows signed off, then go-live with the old system kept warm as a read-only archive.

The switchover promise: no cutover until your numbers match ours, line by line. And if you ever leave, your data exports freely.